Sanitary Sewer System Improvements

The Shamrock Economic Development Corporation hired KSA to prepare a Preliminary for Engineering Report (PER) for sanitary system improvements. These sanitary sewer improvements are intended to serve a prospect constructing a new facility. The scope of the project includes 8,000 linear feet of gravity sanitary sewer mains, replacing an existing lift station and increasing its capacity, and 2,400 linear feet of force main. KSA prepared the PER to satisfy the requirements of the Economic Development Administration (EDA). KSA also assisted with the funding application that resulted in an offer of funding for the proposed improvements.