The City of Jacksboro was approached by several developers interested in developing property on the north side of the City near the intersection of Hwy 148 and Hwy 281. The existing lift station in this area was not able to serve the proposed developments due to size and location.

KSA was hired to work with the City and developers to design and construct a new lift station that would serve the immediate and future needs of all nearby developments.

The existing lift station was converted to a manhole which allowed the waste to be transferred to the new lift station by gravity.

The project included:

  • 2,000 feet of 8-inch and 10-inch gravity sewer
  • 3 submersible pumps at 300 gpm each
  • 8-inch diameter wet well that was 20-feet deep
  • Standby generator
  • Security fencing