Wastewater

Northside Wastewater Treatment Plant

The City of Lindale hired KSA Engineers to design a new wastewater treatment facility to replace an outdated and overloaded aerated lagoon/ stabilization pond facility. The new facility is designed to handle a flow of 1.3 million gallons of waste per day.

The project included headworks, an influent pump station, aeration basin, two final clarifiers, and a UV disinfection system. The project also included a return sludge pump station, sludge holding tank and plastic media sludge drying beds. The design of the facility was unique in that it was designed for a very high organic load due to a canning factory that was discharging into the wastewater collection system.