Wastewater

Springhill Wastewater Treatment

KSA was selected to provide treatment facility improvements to the Springhill wastewater treatment plant. These improvements included converting part of the existing oxidation lagoon to a Biolac wastewater treatment system; constructing collection system extensions; and designing 65,000 linear feet of gravity main extensions, 10,000 linear feet of force main extensions; 156 manholes; and nine lift stations. The project also required site engineering, dynaguard filtering, inlet piping, headwork, and hydraulic improvements.